RM35X0E _57 Power Source / Network _078664 7GR-FKS BATTERY / CHARGING _0386628 GENERATOR A

7GR-FKS BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Install the generator bracket to the generator assembly with the bolt.

Torque:
20 N*m (204 kgf*cm, 15 ft.*lbf)


b.

Install the generator assembly with the 2 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


c.

Install the generator bracket to the cylinder block with the bolt.

Torque:
20 N*m (204 kgf*cm, 15 ft.*lbf)


d.

Attach the wire harness clamp to the generator bracket.


e.

Connect the wire harness to the generator assembly with the bolt.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


f.

Connect the wire harness to terminal B with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


g.

Install the terminal cap.


h.

Connect the generator connector to the generator assembly.


Hide 16604 3.INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

a.

Install the No. 2 idler pulley sub-assembly with the bolt.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)