1.INSTALL AIR SWITCHING VALVE ASSEMBLY
for LH Side:
Using an E8 "TORX" socket wrench, temporarily install the air switching valve assembly with the 2 stud bolts.
Install the air switching valve assembly with the 2 nuts and bolt.
Attach the clamp and connect the No. 1 fuel pipe sub-assembly and No. 2 fuel pipe sub-assembly to the intake air surge tank assembly.
Connect the No. 3 air tube to the air switching valve assembly and slide the clip to secure it.
Connect the air switching valve assembly connector.
for RH Side:
Install the air switching valve assembly with the 3 nuts.
Connect the air tube to the air switching valve assembly and slide the clip to secure it.
Connect the air switching valve assembly connector.
17362
2.INSTALL NO. 2 AIR TUBE
17361N
3.INSTALL NO. 1 AIR TUBE
17125
4.INSTALL NO. 1 SURGE TANK STAY
5.INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
17751
6.INSTALL NO. 1 AIR CLEANER INLET
53106B
7.INSTALL RADIATOR COVER SUB-ASSEMBLY
11209
8.INSTALL V-BANK COVER SUB-ASSEMBLY (w/ Cover)