17430
1.INSTALL TAILPIPE ASSEMBLY
Install the tailpipe assembly to the exhaust pipe support.
17420
2.INSTALL CENTER EXHAUST PIPE ASSEMBLY
Install a new gasket to the center exhaust pipe assembly.
Connect the 3 exhaust pipe supports and install the center exhaust pipe assembly.
| *A | for High Roof | *B | for Standard Roof |
Install the center exhaust pipe assembly to the tailpipe assembly with the 2 bolts.
89465
3.INSTALL HEATED OXYGEN SENSOR (for Bank 2 Sensor 1)
89465
4.INSTALL HEATED OXYGEN SENSOR (for Bank 1 Sensor 1)
17450B
5.INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY
17410
6.INSTALL FRONT EXHAUST PIPE ASSEMBLY
17403
7.INSTALL FRONT NO. 3 EXHAUST PIPE SUB-ASSEMBLY
Install a new gasket to the front No. 3 exhaust pipe sub-assembly.
Connect the 2 exhaust pipe supports.
Install the front No. 3 exhaust pipe sub-assembly to the front exhaust pipe, front No. 2 exhaust pipe and center exhaust pipe assembly with the 6 bolts and 2 compression springs.
| *A | w/ Secondary Air Injection System | *B | w/o Secondary Air Injection System |
8.INSPECT FOR EXHAUST GAS LEAK
If gas leaking, tighten the areas necessary to stop the leak. Replace damaged parts as necessary.
If an exhaust gas leak has been repaired, perform an inspection following the repair (See page Engine / Hybrid System>7GR-FKS (ENGINE CONTROL)>SFI SYSTEM>INITIALIZATION201902,999999,_51,_078720,_0381907,RM100000001G2VV,).
51405A
9.INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
52618
10.INSTALL LOWER FRONT BUMPER ABSORBER
51406A
11.INSTALL NO. 2 ENGINE UNDER COVER SUB-ASSEMBLY (w/ No. 2 Engine Under Cover Sub-assembly)