RM35X0E _51 Engine / Hybrid System _079025 7GR-FKS EMISSION CONTROL _0383273 PCV VALVE A

7GR-FKS EMISSION CONTROL  PCV VALVE  INSTALLATION  


PROCEDURE

Hide 12204 1.INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)

a.

Apply a light coat of engine oil to the O-ring.


b.

w/ Secondary Air Injection System:

Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).

Adhesive:

Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent



c.

Install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover sub-assembly LH.

Torque:
w/o Secondary Air Injection System : 5.0 N*m (51 kgf*cm, 44 in.*lbf)
w/ Secondary Air Injection System : 27 N*m (275 kgf*cm, 20 ft.*lbf)

NOTICE:

When reusing the PCV valve (ventilation valve sub-assembly), inspect the O-ring.



Hide 12261 2.CONNECT PCV HOSE

a.

Connect the PCV hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.


Hide 12601B 3.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (w/o Secondary Air Injection System)

a.

Install the No. 1 engine cover sub-assembly with the bolt to the cylinder head cover sub-assembly LH.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)